Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 33293-2016 |
Determination of shrinkage and expansion of well cement formulations at atmospheric pressure |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5825-2007 |
Procedures of temperature test by a electronic down-hole thermometer |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6707-2016 |
Specification for marine well site survey |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB 50195-1994 |
Design code for producer gas station |
705 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 6264-1996 |
|
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6300-1997 |
General specification of paraffin inhibition and removal agent for the use of oil production |
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6740-2008 |
The calibration method of caliper |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5579.1-2008 |
Reservoir description method—Part 1:General provisions |
510 (USD) |
via email in
1-5 business day
|
VALID
|
|
Q/CNPC 98-2004 |
Trailer for operation |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 5005-2010 |
Specifications of drilling fluid materials |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 5834-1993 |
|
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5613-2000 |
Methods for testing shale physics and chemistry properties |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6543.1-2003 |
Specification for underbalanced drilling technology-Part 1: Methods for design |
225 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6848-2012 |
Specification for design of underground gas storage |
900 (USD) |
via email in
1-8 business day
|
VALID
|
|
GB/T 14090.3-1993 |
Terminology for offshore oil and gas development engineering-Single point mooring unit and positioning system |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB 50160-2008 |
Fire prevention code of petrochemical enterprise design |
2460 (USD) |
via email in
1-10 business day
|
VALID
|
|
SY/T 6596-2004 |
Recommended practice for produced -- water reinjection in gas field |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 19139-2012 |
Testing of well cements |
2460 (USD) |
via email in
1-10 business day
|
VALID
|
|
SY/T 6572-2003 |
Evaluation methods of resin performance for sand control |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
SH/T 3041-2002 |
The specification of piping flexibility design for petrochemical industry |
360 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|