Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 5693-2008 |
Specification for calibration of the C/O spectrum logging tool |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 0069-2008 |
Design code for crude oil stabilization unit |
225 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5955-1999 |
Directional drilling technologyand its quality control requirements |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6574-2003 |
Technical requirement of oil field development project upper evaluation |
195 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5329-1994 |
|
450 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5627-2008 |
Steel ball deliver |
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5504.2-2005 |
Evaluation method for well cement additives -- Part 2: Fluid-loss additive |
420 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5955-2004 |
Trajectory quality for directional well |
75 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6847-2012 |
Technical criterion for igneous reservoir fracturing |
390 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5754-1995 |
|
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5343-2013 |
Determination method for testing the amount of filtrate invading core |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5588-2003 |
Profile modification technology and result evaluation in water injection well |
315 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 11059-2003 |
Crude oil?derermination of saturated vapour pressure?Reference methods |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB 50484-2008 |
Code for technical of construction safety in petrochemical engineering |
2235 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
SY/T 5806-2000 |
Oil and gas stratigraphic code |
345 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5740-2013 |
Technical requirements of polymer flooding development plant design and effect evaluation |
285 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 10045-2003 |
Application of safety instrumented systems for the process industries |
885 (USD) |
via email in
1-8 business day
|
|
|
SY/T 5412-2005 |
Operation code for casing running |
600 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 6150.2-2003 |
Technical standard of tapping & plugging on steel pipeline -- Part 2: The rigide plate-bag stopping on pipeline |
345 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5431-2008 |
The design method of casing program |
285 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|