Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 5625-2008 |
Hydrostatic packer |
255 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5339-2000 |
Recommended practice for sand control technology of artificial borehole |
345 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 19139-2003 |
Procedure for testing well cements |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
SY/T 6473-2000 |
Economic evaluation methods for a petroleum enterprise senergy-saving technical innovation project |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6678-2007 |
The calibration methodology of the electronic dynamometer |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6352-1998 |
Laboratory measurement of electrochemistry on rock |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SYJ 1034-1982 |
Technical regulation for design of refinery telecommunications |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 6333-1997 |
Horizontal drlling technology and its quality control requirements |
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6546-2003 |
Specification for well-logging data processing and interpretation for complicated lithological formation |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 10022.2-2000 |
Specification for Cementing Design of Offshore Oil well Unit 2:Design of Cementing Techique |
255 (USD) |
via email in
1-3 business day
|
|
|
SY/T 6125-2013 |
Technology procedures for gas well testing,gas producting and performance monitoring |
315 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5265-1996 |
Method for efficiency testing and unit energy consumption calculation of oilfield water-injection surface system |
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5836-1993 |
|
345 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
Q/CNPC 63.2-2002 |
|
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5792-2003 |
Technical demands on whisper operation and well completion |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 16782-1997 |
Procedure for field testing oil-based drilling fluids |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
SY/T 5275-2002 |
Eccentric injection tools |
405 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5275.2-2007 |
The water segregator for water injection in oil field Air-core movable water segregator |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6084-2007 |
Using and maintaining for ground drive progressing cavity pumps |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5623-1997 |
|
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
|