Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 6218-1996 |
|
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 10014-1998 |
Guide to programing overall development program for offshore sandstone gas fields |
375 (USD) |
via email in
1-3 business day
|
|
|
GB/T 35206-2017 |
Thin section examination of shale and mudstone |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 0076-2003 |
Design specification of natural gas dehydration |
660 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 5480-2007 |
Specification for cementing design |
405 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 17752-1999 |
Test and evaluation methods on fuel-saving additives of auto-fuel |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
SY/T 6422-1999 |
The measuring for energy conservation effect of energy conservation products in petroleum enterprise |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 8423.2-2018 |
Petroleum and natural gas industries terminology—Part 2:Engineering technical |
2220 (USD) |
via email in
1-10 business day
|
VALID
|
|
SY/T 5587.12-2004 |
Codes for conventional workover job -- Part 12: Fishing |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6722-2008 |
Statistical index and calculation methods for energy consumption and water usage of petroleum enterprise |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5299-2009 |
Code for well line bridge plug and cementing operation |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6196-1996 |
|
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB 50483-2009 |
Code for design of environmental protection of chemical industry projects |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB 50074-2002 |
Code for design of oil depot |
2520 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
SY/T 5168-1999 |
Classifying and coding system for the parts of oil drilling & production equipment |
1005 (USD) |
via email in
1-8 business day
|
|
|
SY/T 5547-2012 |
Operation maintenance and management for positive displacement mud motor |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6223-2013 |
Drilling fluid clarifying equipment arrangement,installation,operation and maintenance |
195 (USD) |
via email in
1-3 business day
|
|
|
GB/T 35110-2017 |
Target optimization methods for marine shale gas exploration |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6125-2006 |
Technology procedures for gas well testing gas producing and performance monitoring |
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5416.3-2007 |
Measurement and inspection regulation of directional surveying instruments Part 3: GYRO |
270 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|