Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 5849-2002 |
The method for economic effect evaluation of removing plugging by chemicals in production and injection well |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5266-1996 |
Efficiency measuring method of artificial lifted well system |
225 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5247-2008 |
Recommended handling methods of downhole problems in driling |
1230 (USD) |
via email in
1-10 business day
|
VALID
|
|
SY/T 6310-2013 |
Technical reguirements for feasible evaluation of gas field development |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5094-1995 |
|
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6448-2000 |
Quality specification for magnetic resonance imaging log information |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5336-1996 |
Method of core routine analysis |
1200 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
SY/T 5416-1997 |
Operation rules of measurement while drilling service |
405 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6903-2012 |
Measurement traceability and transmissibility of magnetic instrument |
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB 50489-2009 |
Code for Design of General Plot Plan and Transportation of Chemical Industrial Enterprises |
2880 (USD) |
via email in
1-10 business day
|
VALID
|
|
GB/T 26979-2011 |
The classification of natural gas pool |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6302-1997 |
Recommended practice for evaluating short term proppant pack conductixity |
345 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6335-1997 |
Evaluation procedure of drilling fluids shale inhibitor |
135 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6616-2005 |
Specifications of well-control equipments arrangement installation and operation for oil and gas well involving sulfide |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6681-2007 |
Form for hardcopy presentation of acquisitionning log data |
630 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 6753-2009 |
General requirements and testing method of detonating tube for oil and gas well |
135 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5952-2005 |
Legend of downhole process strings and tools for hydrocarbon production well and water injection well |
480 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 5185-2016 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 5385-2007 |
Measurement and calculation methods of rock resistivity parameters in laboratory |
270 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6751-2009 |
The technical specifications for operation of underbalanced wireline logging |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|