Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 5710-2002 |
Technology procedure for performance inspection of testing tools |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5340-2000 |
Gravel packing method for sand control in cased hole |
450 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SYT 5827-2005 |
Process of releasing and fishing |
255 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5504.4-2008 |
Evaluation method for well cement additives—Part 4:Accelerator |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6484-2000 |
|
435 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6592-2004 |
Procedure for cement evaluation |
495 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
GB 50424-2007 |
Code for construction of oil and gas transmission pipeline crossing engineering |
1755 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
SY/T 6170-2012 |
The technical indexes of natural gas production and relative calculation methods |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB 50455-2008 |
Code for design of underground oil storage in rock caverns |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 6690-2008 |
Specification for well control technology of downhole operation |
465 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 6644-2006 |
Recommended Practice for Design of Continuous Flow Gas Lift Installations Using Injection Pressure Operated Valves |
1155 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
SY 6350-2008 |
The safe technique procedures for muti-stage self-controlling safe system of oil-gas well perforation |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5964-2006 |
Combination installation adjustment and maintenance of well-control equipments |
405 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5810-2003 |
Design and downhole operation of continuous gas lift |
300 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5416.4-2007 |
Measurement and inspection regulation of directional surveying instruments Part 4:Measurement while drilling with wireline |
195 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6526-2002 |
Measuring method of dynamic reaction rate for hydrochloric acid with carbonate rock |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6675-2007 |
The calibration methodology of the down hole flow meter gauge |
135 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 14090.4-1993 |
Terminology for offshore oil and gas development engineering-Submarine pipeline |
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6162-2008 |
Format for perforation and side-wall coring charts |
225 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5232-1999 |
Specification of application software engineering for petroleum industry |
615 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
|