Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 6243-1996 |
The engineering logging specification of hydrorcarbon exploratory well |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5313-2006 |
Vocabulary of well drilling engineering |
|
via email in
|
|
please email coc@codeofchina.com for quotation
|
SY/T 6595-2004 |
Technology requirement of commercial evaluation to oil field |
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6066-2003 |
The method of energy consumption test and calculation for crude oil pipeline transport system |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 14090.1-1993 |
Terminology for offshore oil and gas development engineering-Comprehension |
285 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6683-2007 |
Technical requirement of development project design for polymer flooding |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5729-1995 |
|
75 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
HG/T 20511-2000 |
Design code for signal alarm and safety interlock system |
270 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6329-1997 |
Logical structure of the database for gas-field |
2040 (USD) |
via email in
1-10 business day
|
|
|
SY/T 6705-2007 |
Directives for design rule of petroleum industry data element |
405 (USD) |
via email in
1-3 business day
|
|
|
SY/T 5957-1994 |
|
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5172-2007 |
Specifications for trajectory control in straight holes |
135 (USD) |
via email in
1-3 business day
|
|
|
SY/T 6214-1996 |
|
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
Q/CNPC 103-2004 |
|
195 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6395-1999 |
Procedure for testing heavy brines |
345 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 16783.1-2006 |
Petroleum and natural gas industries - Field testing of drilling fluids - Part 1: Water-based fluids |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
SY/T 5466-2004 |
Well site preparation and layout requirements |
495 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 5106-1998 |
General technical factors for packer used in oil and gas field |
225 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 0042-2002 |
Calculation standard of economic appraisals for corrosion control project |
885 (USD) |
via email in
1-8 business day
|
|
|
SY/T 5753-1995 |
|
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|