Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
T/CEC 176-2018 |
Specification of battery monitoring and control data management for large electrochemical energy storage station |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 5182-2004 |
Technical rule for designing of local equipment installation pipeline and cables of I&C in power plant |
1170 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 571-2007 |
Guide for operation and maintenance of phosphate ester fire-resistant fluid used in power plant |
255 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/Z 790.53-2004 |
Distribution automation using distribution line carrier systems- Part 5-3: Lower layer profilers- Spread spectrum adaptive wideband (SS-AW) profile |
255 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5161.14-2002 |
Specification for construction quality checkout and evaluation of electric equipment installation Part 14:Crane |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 850-2004 |
Pipie fabrication for power stations |
345 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 760.3-2012 |
Grading ring、shielding ring、grading and shielding ring |
210 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1022-2006 |
Technical specification for fossil-fuel power plant simulator |
435 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
T/CEC 128-2016 |
Determination of acidity in insulating paper |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 1035.1-2006 |
Guidelines for the Maintenance of Circulating Fluidized Bed Boilers Part1: General guidelines |
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5210.5-2009 |
Code for construction quality acceptance and evlauation of electric power construct Part 5:Piping&System |
1770 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 938-2005 |
Analytical method for effluent quality of thermal power plant |
165 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 790.4512-2006 |
Distribution automation using distribution line carrier systems-Part 4-512:Data communication protocols-systems management using Base(MIB) |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 5216-2005 |
Design rule for 35kV~220kV urban under ground substation |
945 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 809-2002 |
Water quality -- Determination of turbidity |
75 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 860.72-2004 |
Communication networks and systems in substations Part 7-2: Basic communication structure for substation and feeder equipment -- Abstract communication service interfaces |
1845 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL 647-2004 |
Inspection code for boiler and pressure vessel in thermal power plant |
1290 (USD) |
via email in
1-10 business day
|
VALID
|
|
DL/T 5138-2001 |
Technical specifications for aerial photographing and surveying of overhead transmission line |
1680 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 502.12-2006 |
Analytical methods of steam and water in power plants Part 12: Determination of sulfate (Volumetric method) |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 912-2005 |
Quality criterion of water and steam for supercritical pressure units in fossil fuel power plant |
105 (USD) |
via email in
1-3 business day
|
|
|
|