Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 802.4-2007 |
Technical requirements for electric cable conduits Part 4:Double wall corrugated cable conduits of chlorinated polyvinyl chloride and unplasticized polyvinyl chloride |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1117-2009 |
The specification of welding procedure qualification for Conventional Island of nuclear power station |
615 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/Z 952-2005 |
Guide for the acceptance of ultrafiltration equipment for water treatment in fossil fuel power plant |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5161.16-2002 |
Specification for construction quality checkout and evaluation of electric equipment installation Part 16:1kV and under feeder cable engineering |
60 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5202-2004 |
Technical code for designing of electric energy metering system |
450 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5222-2005 |
Design technical rule for selecting conductor and electrical equipment |
3600 (USD) |
via email in
1-10 business day
|
VALID
|
|
DL/T 760.3-2001 |
Grading ring、shielding ring、grading and shielding ring |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 860.73-2004 |
Communication networks and systems in substations Part 7-3: Basic communication structure for substation and feeder equipment -- Common data classes |
855 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 1131-2009 |
System Test Standard for ±800kV HVDC Project |
480 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 799.3-2002 |
Labour environment monitoring technological specification of eletric power industry Part 3: Monitoring of indstrial noise |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 805.1-2002 |
Guideline for cycle chemistry in fossil plants -- Part 1: Guideline for feed-water oxygenated treatment of once-through boiler |
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5374-2008 |
Regulation for content and depth of pre-feasibility study Report of fossil fuel power plant |
315 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 820-2002 |
The code of ultrasonic inspection section for butt welds of pipes |
450 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 776-2001 |
Technical requirements for insulation material of thermal power plants |
255 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 849.1-2004 |
General technical specification of test instruments used for power equipments Part 1: Fault flashover test instrument for power cable |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1082-2008 |
Technical requirement of high voltage laboratory |
225 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 759-2001 |
Link fittings |
330 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 7595-2017E |
Quality criteria of in-service transformer oils |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 805.2-2004 |
Guideline for cycle chemistry in fossil plants -- Part 2: Phosphate treatment for drum units |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5133-2001 |
Design guide of construction equipment selection for hydropower and water conservancy project |
1170 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
|