Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
HJ/T 178-2005 |
Flue gas circulation fluidized bed desulfurization project technical specification of thermal power plant |
300 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5448-2012 |
Regulation for content and depth of feasibility study of transmission and substation |
660 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 802.3-2007 |
Technical requirements for electric cable conduits Part 3:Cable conduits of chlorinated polyvinyl chloride and unplasticized polyvinyl chloride |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1035.3-2006 |
Guidelines for the Maintenance of Circulating Fluidized Bed Boilers Part3: The maintenance of coal conveying air and flue gas system |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5439-2009 |
Design regulations of content and profundity for hydro and fossil fuel power plant connecting to the system |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 5341-2011 |
Code of valuation with bill quantity of electric power construction works Transformer substation works |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DL/T 802.2-2007 |
Technical requirements for electric cable conduits Part 2:Cable conduits of fiberglass reinforced plastics |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 802.1-2007 |
Technical requirements for electric cable conduits Part 1:General |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 469-2004 |
Fans performance testing in situ for power boiler |
1095 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 5358-2006 |
Technical code for anticorrosion of metal structures in hydroelectric and hydraulic engineering |
1140 (USD) |
via email in
1-8 business day
|
VALID
|
|
GB/T 10869-2008 |
Control valves for power station |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 502.5-2006 |
Analytical methods of steam and water in power plants Part 5: Determination of acidity |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 775-2001 |
Commisioning code for I&C system of ash and slag in fossil fuel power plant |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 50297-2006 |
Standard for basic terms of electric power engineering |
3735 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 795-2001 |
Digital exchange for power system dispatching |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 502.4-2006 |
Analytical methods of steam and water in power plants Part 4: Determination of chloride (Electrode method) |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5161.12-2002 |
Specification for construction quality checkout and evaluation of electric equipment installation Part 12:Low-voltage apparatus |
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 28558-2012 |
Supercritical and ultra-supercritical generating set parameter series |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 25737-2010 |
Acceptance norms for 1 000 kV substation monitoring system |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 502.22-2006 |
Analytical methods of steam and water in power plants Part 22: Determination of chemical oxygen demand (Potassium per-chlorate method) |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
|