Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 5375-2008 |
Regulation for content and depth of feasibility study report of fossil fuel power plant |
930 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 5147-2001 |
Designing technical rules for security and automaticity equipment of power system |
300 (USD) |
via email in
1-3 business day
|
|
|
DL/T 5210.1-2005 |
Specification for construction quality acceptance and evaluation of electric power construct Part 1: Civil construction engineering |
10335 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 5020-2007 |
Code for preparation of hydroelectric project feasibility study report |
1170 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 524-2002 |
Specification for power line carrier transceiver dedicated to protection |
210 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 768.7-2012 |
Manufacture quality specification for electric power fittings hot dip galvanized coatings on fabricated iron and steel articles |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 765.2-2004 |
Overhead conductor fittings of rated voltages up to 10kv |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1034-2006 |
Guide for 135MW grade circulating fluidized bed boiler operation |
690 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 799.1-2002 |
Labour environment monitoring technological specification of eletric power industry Part 1: General principles |
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1053-2007 |
Technology supervision code for quality of electric energy |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 846.2-2004 |
General technical specifications for high voltage test equipments Part 2: Impulse voltage measuring system |
270 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 658-2006 |
Code for on-line acceptance test of sequence control system in fossil fuel power plant |
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 356-2010 |
Calibration specification of partial discharge measuring devices |
330 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1035.6-2006 |
(Guide of maintenance of CFB boiler unit for thermal power station Part6: The maintenance of fly-ash recirculation bed-material makeup limestone systems)??? |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 502.11-2006 |
Analytical methods of steam and water in power plants Part 11: Determination of sulfate (Spectrometric method) |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 931-2005 |
The rule of physico-chemical personnel qualification in electric power industry |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5224-2005 |
Technical rule for the design of HVDC earth return operation system |
1500 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 5156.3-2002 |
Electric power engineering surveying drawings Part 3:Hydrometeorology |
510 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 1100.1-2009 |
Time synchronism systems of power system Part 1:Technical specifications |
360 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 17627.2-1998 |
High-voltage test techniques for low-voltage equipment Part 2: Measuring system and test equipment |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
|