Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 932-2005 |
Guide of operation and maintenance for the condenser and vacuum system of power plant |
315 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 435-1991 |
|
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 491-1999 |
Code for operating and overhauling of static rectification excitation system equipment of large and medium-sized hydraulic generator |
330 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 660-2007 |
Test procedure for the viscosity of coal ash in high-temperature |
255 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 956-2005 |
Guide for lay-up of thermal power equipment in fossil fuel power plant |
465 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 1149-2010 |
Guide for operating flue gas limestone/lime-gypsum desulphurization in thermal power plants |
255 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1195-2012 |
Specifications of operation and maintenance for high voltage variable frequency drive used in fossil-fuel power plants |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 901-2004 |
Acid-resting materials of chimney lining for fossil fuel power plant |
270 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1072-2007 |
Rules for in-site periodic tests of pumps in nuclear power plant |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 903-2004 |
Technical guide for surfacing parts of coal pulverizer |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 619-1997 |
Code of operation maintenance overhaul and test for automatic control components and their related systems for hydrogenerating sets |
465 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 1026-2006 |
Quality assurance for maintenance of non-nuclear safety equipment in nuclear power plant |
345 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1025-2006 |
Technical supervision codes for metal in nuclear power plants |
315 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1035.2-2006 |
Guidelines for the Maintenance of Circulating Fluidized Bed Boilers Part2: The maintenance of boiler body |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 440-2004 |
The code of inspection and evaluation for existing boiler drum in fossil-fuel power plants |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 905-2004 |
Technical guide for repair welding of turbine blades |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
CJ/T 534-2018 |
Circulating water pump for swimming pool and SPA pool |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 1148-2009 |
Patrol system for power cables |
195 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 461-2004 |
Guide for operation and the maintenance of electrostatic precipitators for coal-fired power plants |
345 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 934-2005 |
The rules for measuring and evaluating thermal insulation of thermal power plant |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
|