Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 924-2005 |
Specification for supervisory information system for plant level of fossil fuel power plant |
435 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 748.3-2001 |
Guide of maintenance of boiler unit for thermal power station Part 3 : The maintenance of valves and steam-water system |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 941-2005 |
Quality standard for sulphur hexafluoride of transformer in service |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 986-2005 |
The wet FGD processing property detection technical regulation |
300 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 435-2004 |
Code for the prevention of pulverized coal firing furnace explosions/implosions in power plant boilers |
375 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 774-2001 |
Guide for operation and maintenance of distributed control system in fossil fuel power plant |
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 748.8-2001 |
Guide of maintenance of boiler unit for thermal power station Part 8 : The maintenance of air preheater |
450 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 940-2005 |
The technical guide for the life assessment of steam pipe in fossil fuel power plant |
255 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 748.9-2001 |
Guide of maintenance of boiler unit for thermal power station Part 9 : The maintenance of fly ash system |
285 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 723-2000 |
Technical guide for electric power system security and stability control |
285 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 774-2004 |
Overhaul & operate of thermodynamic automatic system in fossil fuel power plant |
2820 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 889-2004 |
Guide of chemistry supervision of thermal equipments for power station capital construction |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1054-2007 |
Technical supervision code for the insulation of high voltage electric equipment |
345 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 441-2004 |
Supervision code for creep strain of steam pipe in high temperature and high pressure in fossil fuel power plant |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 902-2004 |
Technical requirements and test methods of abrasion resistant refractory material |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 862-2004 |
Code of operation management and inspection for transmitters/transducers of non-electric in hydraulic power plant |
375 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 805.4-2004 |
Guideline for cycle chemistry in fossil plants -- Part 4: Feed water treatment |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 741-2001 |
Operating code for overhead transmission line |
465 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 340-2010 |
Guide for circulating fluidized bed boiler start-up and commissioning |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 838-2003 |
Guide of maintenance for power plant equipments |
1260 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
|