Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 1132-2009 |
Maintaining guide of boiler water circulating pump motor for power station |
195 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 797-2001 |
Code on maintenance of wind farm |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 750-2001 |
Regulations for operation and maintenance of rotary air preheater |
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 724-2000 |
Specification of operation and maintenance of battery DC power supply equipment for electric power system |
345 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 894-2004 |
Guide of commissioning for ash and slag handling system in power plant |
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1228-2013 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 491-2008 |
Code for operating and overhauling of self-shung exciction system equipment of large and medium-sized hydraulic generator |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 748.5-2001 |
Guide of maintenance of boiler unit for thermal power station Part 5 : The maintenance of air & flue system |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 794-2001 |
Chemical cleaning guide for steam power plant |
900 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 939-2005 |
Guide for boiler tube monitoring and inspection in fossil fuel power plant |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 710-1999 |
Code of operation for hydraulic turbines |
330 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL 5007-1992 |
|
600 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 748.1-2001 |
Guide of maintenance of boiler unit for thermal power station Part 1 : General rules |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 834-2003 |
Guide for prevention of water and cool steam damage to steam turbines in fossil power plant |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 387-2010 |
Guideline of flue gas bag filter selection for thermal power plants |
270 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 942-2005 |
Method of pulverized coal sampling in direct firing pulverizing systems |
255 (USD) |
via email in
1-3 business day
|
|
|
DL/T 748.6-2001 |
Guide of maintenance of boiler unit for thermal power station Part 6 : the maintenance of precipitator |
255 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 836-2003 |
Reliability evaluation code for customer service in power supply system |
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1034-2006 |
Guide for 135MW grade circulating fluidized bed boiler operation |
690 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 1035.6-2006 |
(Guide of maintenance of CFB boiler unit for thermal power station Part6: The maintenance of fly-ash recirculation bed-material makeup limestone systems)??? |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|