Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 5325-2013 |
The technical specifications for perforating operation |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 6411.2-2008 |
Testing method of detonating cord for oil and gas well |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6331-1997 |
Technical code for design of energy conservation for gas field surface engineering |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5122-1999 |
Analytical method of element Carbon Hydrogen and Oxygen in onganic matter of rock |
105 (USD) |
via email in
1-3 business day
|
|
|
SH 3501-2002 |
Specification for construction and acceptance of hypertoxic and combustible medium piping engineering in petrochemical industry |
510 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 0006-1999 |
Code for design of oil field produced water treatment |
930 (USD) |
via email in
1-8 business day
|
|
|
SY/T 6721-2008 |
The method of water balance test and calculation for oilfield production system |
195 (USD) |
via email in
1-3 business day
|
|
|
SY/T 5088-2002 |
Wellbore quality evaluation items and calculation methods |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5579.2-2008 |
Reservoir description method—Part 2:Fragmental reservoir |
345 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5346-2005 |
Rock capillary pressure measurement |
300 (USD) |
via email in
1-3 business day
|
|
|
SY/T 6426-1999 |
Specification for well control technology of driling |
465 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 5815-2016 |
Measurement method for rock pore volume compressibility |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 6692-2007 |
The operating regulation of logging while drilling |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 10027-2001 |
Technical specification for marine high resolution seismic data acquisition |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6373-1998 |
The economic operation specification of electric power suply and distribution system for oil and gas field |
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5587.14-2013 |
odes for conventional workover job—Part14:Cementing plug and drilling out |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6264-2006 |
Specifications of major repair project design for oil gas water well |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5361-2007 |
Procedures for the cut-and-thread fishing operation |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6168-1995 |
|
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 10023.1-1999 |
The Recommended Method of Offshore Oil/Gas Field Development project Economic Evaluation Part1:Self Financed Offshore Oil/Gas Field |
435 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|