Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
JB/T 8194-2001 |
Terminology for electric power plant with internal combustion engines |
480 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 847-2004 |
Guide for drafting the documentation of quality management systems for power supply company |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5187.1-2004 |
Technical coal for designing coal handling of fossil fuel power plant Part 1:Coal handling system |
2430 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
GB/T 17623-2017 |
Determination of componental contents of gases dissolvedin insulating oil by gas chromatography method |
480 (USD) |
via email in
1-5 business day
|
VALID
|
|
T/CEC 140-2017 |
Method of purity measurement of SF6 insulated gas in electrical equipment |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/Z 860.2-2006 |
Communication networks and systems in substations Part 2: Glossary |
540 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 382-2010 |
Norm for environmental monitoring manage of thermal power plants |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 26866-2011 |
Testing specifications of time synchronism systems for power system |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5465-2013 |
Guidelines for construction detail design estimate of fossil fired power project |
330 (USD) |
via email in
1-3 business day
|
VALID
|
|
T/CEC 127-2016 |
Standard test method for kinematic viscosity of transformer and turbine oils by automated houillon viscometer |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB 50229-2006 |
Code for design of fire protection for fossil fuel power plants and substations |
2490 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 502.31-2006 |
Analytical methods of steam and water in power plants Part 31: Determination of stability index |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 829-2002 |
Technical reqirements for stoking single phase alternating current induction watt-hour meter |
285 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 768.3-2002 |
Manufacture quality specification for electric power fittings stampings |
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1027-2006 |
Acceptance test specification of industrial cooling tower |
375 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5764-2018 |
Evaluating standard for quality of thermal power engineering |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 502.3-2006 |
Analytical methods of steam and water in power plants Part 3: Determination of total sillicon (Spectrometric method by conversion with hydrofluoric acid) |
135 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 36045-2018 |
Supervision specification of unit capacity expansion retrofit for coal-fired power plants |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
T/CEC 156.4-2018 |
Technical specification for intelligent coal system of thermal power plant Part 4:Equiphment and facility for coal yard |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 1074-2007 |
Integrated uninterruptible power supply equipment of DC and AC for power system |
465 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
|