Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 940-2005 |
The technical guide for the life assessment of steam pipe in fossil fuel power plant |
255 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 933-2005 |
Test methods for determining the performance of cooling tower of transfer packing drift eliminator and sprayer |
315 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5210.3-2018 |
Code for construction quality acceptance of electric power construct Part 3: steam turbine generator unit |
6195 (USD) |
via email in
1-10 business day
|
VALID
|
|
DL/T 5210.6-2009 |
Specification for construction quality acceptance and evaluation of electric power construct Part 6:The equipment and the system with the water treatment and hydrogen generation |
3030 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
GB/T 15153.2-2000 |
Telecontrol equipment and systems--Part 2: Operating conditions--Section 2: Environmental conditions (climatic, mechanical and other non-electrical influences) |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5218-2005 |
Technical code for designing 220kV~500kV substation |
1365 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 1073-2007 |
General specifications for high speed transfer equipment for the power supplies for auxiliary equipment in power plant |
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 846.5-2004 |
General technical specifications for high voltage test equipments Part 5: Analyzer for trace moisture in SF6 gas |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 770-2001 |
General specifications for microprocessor-based transformer protection equipment |
225 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 401-2002 |
Guide to the selection of high-voltage cables |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5339-2006 |
Code for hydraulic design of fossil fuel power plants |
2880 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
GB/T 7596-2017E |
Quality criteria of in-service mineral turbine oils in power plants |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 965-2005 |
Essential criteria for the operation of bodies performing thermal equipments inspection |
195 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5146-2001 |
Technical code for the surveying of 35kV~220kV overhead transmission lines |
1140 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 655-2006 |
Code for acceptance test of furnace safeguard supervisory system in fossil fuel power plant |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5161.5-2002 |
Specification for construction quality checkout and evaluation of electric equipment installation Part 5:Cable line |
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 28566-2012 |
Security specification and its evaluation for generating unit interconnection |
780 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 5203-2005 |
Technical code for explosion prevention design of coal and pulverized coal preparation system of fossil fuel power plant |
960 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 502.9-2006 |
Analytical methods of steam and water in power plants Part 9: Determination of aluminum (Spectrometric method using pyrocatechol violet) |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL 784-2001 |
The technical code for transposing strain insulator on 330kV energized transmission line |
105 (USD) |
via email in
1-3 business day
|
|
|
|