Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SH/T 3420-2007 |
General specification of air preheater for tubular heater in petrochemical industry |
135 (USD) |
via email in
1-3 business day
|
VALID
|
|
JB/T 1119-1999 |
Holding-down clip |
75 (USD) |
via email in
1-3 business day
|
VALID
|
|
SH/T 3544-2009 |
Specificaton for construction and acceptance of petrochemical opposed reciprocating compressor unit |
630 (USD) |
via email in
1-5 business day
|
VALID
|
|
SY/T 6936-2013 |
Liquefied natural gas glossary |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6679.3-2009 |
Calibration method of mud-logging unit—Part 3: Data Acquisition System |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY 4201.2-2016 |
Code for quality acceptance of oil and gas construction engineering-Equipment installation engineering-Part 1:Mechanism and pump |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
SY/T 0523-2008 |
Oilfield water treatment filter |
195 (USD) |
via email in
1-3 business day
|
VALID
|
|
JB/T 1120-1999 |
Double-sided dismountable fastenings |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6928-2012 |
Operation regulation for liquefied natural gas receiving terminal |
420 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 0025-1995 |
Classification of locations for electrical installations at petroleum facilities |
945 (USD) |
via email in
1-8 business day
|
|
|
SY/T 0540-2013 |
Type and basal parameters for heater used in petroleum industry |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5327-1999 |
Radioactive species carrier tracer logging |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY 4201.1-2007 |
Code for quality acceptance of oil and gas construction engineering Equipment installation engineering Part 1:Mechanism and pump device |
675 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 0515-2007 |
Specification for oil and gas separators |
360 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 21451.3-2017 |
Petroleum and liquid petroleum products—Measurement of level and temperature in storage tanks by automatic methods—Part 3:Measurement of level in pressurized tanks(non-refrigerated) |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 0083-2008 |
Design specification of oil removal tank |
225 (USD) |
via email in
1-3 business day
|
VALID
|
|
SH/T 3036-2003 |
Fired heaters for general refinery service |
2880 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
SY/T 5680-1995 |
|
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 7074-2016 |
Calibration method of HTHP drilling fluid filter press |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 0538-2004 |
Code for tubular heater |
630 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
|