Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 6410-1999 |
Calibration for logging tool on production well profile |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SH/T 3075-2009 |
Specificaton of material selections for steel pressure vessels in petrochemical industry |
615 (USD) |
via email in
1-5 business day
|
VALID
|
|
SY 0031-2004 |
Safety regulations for heaters used in petroleum industry |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 50392-2006 |
Code for design of cooling tower for mechanical ventilation |
1830 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
SH/T 3541-2007 |
Specification for construction and acceptance of pump unit installation in petrochemical industry |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY 4205-2016 |
Code for quality acceptance of oil and gas construction engineering. Automation instrumentation engineering |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
SH/T 3167-2012 |
|
900 (USD) |
via email in
1-8 business day
|
VALID
|
|
SY 0031-2012 |
Safety regulations for heaters used in petroleum industry |
210 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 0524-2008 |
Code for heater system with heat-transfer oil |
990 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
SH/T 3121-2000 |
Specification of process design in petroleum processing units |
555 (USD) |
via email in
1-5 business day
|
VALID
|
|
JB/T 2878.2-1999 |
X2-type wedge holding-down clip |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 7081-2016 |
Calibrating method for calibration device of geophone tester |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 6961-2013 |
Truck-mounted reciprocating compressor set used in oil and gas fields |
285 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY 4201.4-2016 |
Code for quality acceptance of oil and gas construction engineering. Equipment installation engineering. Part 4-Furance |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
JB/T 1212-1999 |
Round bubble cap |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 20173-2013 |
Petroleum and natural gas industries—Pipeline transportation systems—Pipeline valves |
1200 (USD) |
via email in
1-8 business day
|
VALID
|
|
SH/T 3542-2007 |
Construction technical procedure for petrochemical static equipment installation work |
465 (USD) |
via email in
1-5 business day
|
VALID
|
|
SY/T 0518-2002 |
Specification for design of steel buttwelding fittings for oil & gas pipeline |
735 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 6945-2013 |
Guidelines on the failure analysis for petroleum tubular goods |
285 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY 4205-2007 |
Code for quality acceptance of oil and gas construction engineering automation instrumentation engineering |
705 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
|