Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 7440-1987 |
Calculating methods and measuring methods for transmission parameters of open-wire communication lines |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 11015-1989 |
Interface between data terminal equipment and automatic calling equipment for data communication |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 38798-2020 |
Technical requirements for security of integrated broadband access network |
180 (USD) |
via email in
1-3 business day
|
TO BE VALID
|
|
YD/T 926.1-2009 |
Telecommunication Generic Cabling System for Building Part 1: Generic Specification |
1185 (USD) |
via email in
1-8 business day
|
VALID
|
|
YD/T 1301-2004 |
Test method for access network--26GHz Local Multi-point Distribution System (LMDS) |
555 (USD) |
via email in
1-5 business day
|
VALID
|
|
YD/T 1809-2008 |
Testing Methods for Access Network——Interoperability of EPON Systems |
825 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
YD/T 1298-2004 |
Access network technical specification--Home PNA1.1 Based Phoneline Networking Device |
480 (USD) |
via email in
1-5 business day
|
VALID
|
|
YD/T 1380.2-2005 |
Technical requirements of V5 interface Part 2:V5.2 interface |
2700 (USD) |
via email in
1-10 business day
|
VALID
|
|
GB/T 11594-2009 |
List of definitions for interchange circuits between data terminal equipment(DTE) and data circuit-terminating equipment (DCE) on public data networks |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 11592-1989 |
Interface between data terminal equipment (DTE) and data circuit-terminating equipment (DCE) for start-stop transmission services on public data networks |
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
YD/T 841.3-2008 |
Plastic Pipe for Buried Communication Conduit Part 3:Double-Wall Corrugated Pipe |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 19856.2-2005 |
Lightning protection—Telecommunication lines—Part 2:Lines using metallic conductors |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
YD/T 1347-2005 |
Technical requirements for access network--remote management of Asymmetric Digital Subscriber Line(ADSL) CPE |
900 (USD) |
via email in
1-8 business day
|
|
|
YD/T 841.2-2008 |
Plastic Pipe for Buried Communication Conduit Part 2:Solid-Wall Pipe |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
YD/T 1314-2004 |
Test method for access network--Very-high-speed Digital Subscriber Line (VDSL) |
1290 (USD) |
via email in
1-10 business day
|
|
|
YD/T 1951-2009 |
Technical Requirements for Access Network--DSL Single-Ended Line Testing System |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
YD/T 1949.2-2009 |
Technical requirements for access network – Gigabit-capable passive optical network (GPON) Part2: Physical media dependent (PMD) layer requirements |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
YD/T 2049-2009 |
Test method of security for access network equipment——Digital subscriber line access multiplexer |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
YD/T 617-1993 |
|
315 (USD) |
via email in
1-3 business day
|
|
|
YD/T 1530-2006 |
Technical Requirements For Access Network Extended bandwidth 2nd-generation Asymmetric Digital Subscriber Line(ADSL2+) |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
|