Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
YD/T 841.6-2017 |
Plastic duct for telecommunication underground conduit—Part 6: Grid duct |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
YD/T 2019.1-2009 |
Test method for broadband customer network equipment based on public telecommunication network Part 1:Gateway |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
YD/T 1950-2009 |
Technical Requirements for Access network——ADSL line Transceiver (ATU-C)In-band Management |
570 (USD) |
via email in
1-5 business day
|
|
|
GB/T 37172-2018 |
Test methods for access network equipment—Interoperability of EPON system |
900 (USD) |
via email in
1-8 business day
|
VALID
|
|
YD/T 1994.2-2009 |
Remote management technical requirements for access network CPE Part 2: interface protocol |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
YD/T 1188-2008 |
Technical Specification for Access Network——ADSL/ADSL2+CPE |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
YD/T 2051-2009 |
Test method of security for access network equipment ——Passive Optical Network (PON) |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 7618-1987 |
Electrical characteristics for unbalanced double-current interchange circuits for general use with integrated circuit equipment in the field of data communications |
270 (USD) |
via email in
1-3 business day
|
VALID
|
|
YD/T 1254-2003 |
Access network technical specification-TDD based Ethernet Digital Subscriber Line system (TDD-EDSL):variable length frame transmission mode |
630 (USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 38832-2020 |
|
3120 (USD) |
via email in
1-10 business day
|
TO BE VALID
|
|
YD/T 1187-2006 |
Technical Requirements and Test Methods for ADSL/VDSL Splitter |
435 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 33843-2017 |
Test method for access network equipment—Passive optical network based on ethernet(EPON) |
840 (USD) |
via email in
1-8 business day
|
VALID
|
|
YD/T 1418-2005 |
Technical Requirements for Access Network-Multi-Service Access Node(MSAN) |
360 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
YD/T 1807-2008 |
Technical Requirements for Access Network——Point to Point Optical Ethernet Access System |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 3454-2011 |
List of definitions for interchange circuits between data terminal equipment(DTE) and data circuit-terminating equipment(DCE) |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 37173-2018 |
Technical requirements for access network—Interoperability of GPON system |
900 (USD) |
via email in
1-8 business day
|
VALID
|
|
YD/T 1808-2008 |
Testing Methods for Access Network Equipment-2nd-generation Asymmetric Digital Subscriber line (ADSL 2)and Extended Bandwidth 2nd-generation Asymmetric Digital Subscriber Line (ADSL 2plus) |
870 (USD) |
via email in
1-8 business day
|
VALID
|
|
YD/T 1186-2002 |
Access network technical specification-26GHz Local Multi-point Distribution System(LMDS) |
495 (USD) |
via email in
1-5 business day
|
VALID
|
|
YD/T 1996.2-2009 |
Technical requirements for access network Very high speed digital subscriber line 2 (VDSL2) Part 2 : Transceivers |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 3455-1982 |
Electrical characteristics for unbalanced double-current interchange circuits |
60 (USD) |
via email in
1-3 business day
|
VALID
|
|
|