Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 9652.1-1997 |
Specifications of governors and pressure oil supply units for hydraulic turbines |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DL/T 1043-2007 |
The vibrating steel wire jointmeter |
165 (USD) |
via email in
1-3 business day
|
VALID
|
|
YBJ 11-1986 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 35707-2017 |
Guide for hydropower plant identification system |
960 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 5064-2007 |
Design specifications for land requisition resident relocation planning of hydroelectric project |
870 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 5410-2009 |
|
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
SL 634-2012 |
nspection and Assessment Standard for Separated Item Project Construction Quality of Water Conservancey and Hydroelectric Engineering-Levee Works |
900 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 5368-2007 |
Code for rock tests of hydroelectric and water conservancy engineering |
1020 (USD) |
via email in
1-8 business day
|
VALID
|
|
GB/T 17189-1997 |
Code for field measurement of vibrations and pulsations in hydraulic machines |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DL/T 5194-2004 |
Code of water quality analysis for hydropower and water resources engineering geological investigation |
4785 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 1014-2006 |
Regulation of operation and maintence for automatic system of hydrological collection and transmission |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 15613.3-2008 |
Model acceptance tests of hydraulic turbines storage pumps and pump-turbine - Part 3: Additional performance test |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 5139-2001 |
Specification for designing gas-insulation metal-enclosed switchgear of hydropower station |
660 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 5152-2001 |
Test code of water analysis for hydraulic concrete |
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB 8564-1988 |
Specification for installation of hydraulic-turbine and generator units |
780 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 5212-2005 |
Code on compiling tender design report of hydropower projects |
2205 (USD) |
via email in
1-10 business day
|
VALID
|
|
GB/T 17189-2007 |
Code for field measurement of vibrations and pulsation in hydraulic machines(turbines storage pumps and pump-turbines) |
720 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 1135-2009 |
Potentiometric type displacementmeter |
165 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5013-2005 |
Code of operation in drilling for hydropower and hydraulic engineering |
1710 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
GB/T 15468-2020 |
Fundamental technical requirements for hydraulic turbines |
720 (USD) |
via email in
1-5 business day
|
TO BE VALID
|
|
|