Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 1046-2007 |
Horizontal displacement gauge of tensional wire |
135 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5193-2004 |
Technical code of epoxy resin mortar |
1365 (USD) |
via email in
1-10 business day
|
VALID
|
|
DL/T 5181-2003 |
Construction specifications for anchor and shotcrete support of hydropower and water conservancy engineering |
1335 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 5170-2002 |
Technical code for investigation of geotechnical engineering of substation |
1725 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 507-2002 |
Start-up test code for hydraulic-turbine and generator units |
270 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5380-2007 |
Design specifications for resident relocation and township construction planning of hydroelectric project |
390 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5377-2007 |
Specifications for drawing-up of boundary line of land requisition and treatment of hydroelectric project |
450 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SL 637-2012 |
Inspection and assessment standard for separated item project construction quality of water conservancy and hydroelectric engineering-Installation of hydraulic mechanical auxiliary equipment system |
825 (USD) |
via email in
1-8 business day
|
VALID
|
|
GB/T 50485-2009 |
Technical code for microirrigation engineering |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SL 357-2006 |
Code of feasibility study report of rural hydropower station |
885 (USD) |
via email in
1-8 business day
|
VALID
|
|
SL 631-2012 |
Insptection and Assessment Standard for Separated Item Project Construction Quality of Water Conservancy and Hydroelectric Engineering-Earth-Rock Works |
1155 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 5351-2006 |
Drawing standard of geologic for hydropower and water resources project |
825 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 1045-2007 |
vibrating wire piezometers |
195 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5337-2006 |
Technical code for engineering geological investigation of slope for hydropower and water resources project |
510 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 5263-2010 |
|
345 (USD) |
via email in
1-3 business day
|
VALID
|
|
JB/T 10484-2004 |
Technical specification for main shaft of large turbine |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5113.1-2005 |
Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 1:Civil department |
2250 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 5255-2010 |
Technical specification of slope construction for hydropower and water conservancy project |
1065 (USD) |
via email in
1-8 business day
|
VALID
|
|
SL 578-2012 |
Technical code for experiment and application of wet-ground fine cement grouting material |
|
via email in
1-3 business day
|
|
please email coc@codeofchina.com for quotation
|
DL/T 5198-2004 |
Code for the construction of crane girders anchored to rock face for hydropower and water resources projects |
405 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|