Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 5403-2007 |
Specification for commissioning and quality acceptance and evaluation of flue gas desulphurization for coal-fired power plant |
1470 (USD) |
via email in
1-10 business day
|
VALID
|
|
DL 493-2001 |
The rural electric safe working code |
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 932-2005 |
Guide of operation and maintenance for the condenser and vacuum system of power plant |
315 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 846.8-2004 |
General technical specifications for high voltage test equipments Part 8: Detector of on-load tap-changers |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/Z 790.55-2004 |
Distribution automation using distribution line carrier system-Part 5-5:Lower layer profilers-Spread spectrum-fast frequency hopping(SS-FFH) profile |
330 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 953-2005 |
Determination for heat resistance of strongly basic anion exchange resins used in water treatment |
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 502.2-2006 |
Analytical methods of steam and water in power plants Part 2: Sampling method for steam and water |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5156.2-2002 |
Electric power engineering surveying drawings Part 2:Geotechnical engineering |
870 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 773-2001 |
Spheroidization evaluation standard of 12Cr1MoV steel used in power plant |
225 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 866-2004 |
The guide for selection and calculation of current transformers and voltage transformers |
870 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 787-2001 |
The gradational standard of spherular pearlite for 150CrMo steel used in fossil power plant |
210 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5227-2005 |
Technical rule of thermal power automation design for auxiliary system (shop) of fossil fuel power plant |
510 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 845.4-2004 |
General specifications for measuring resistance equipments Part 4: Loop resistance measurement testor |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5174-2003 |
Design rule for combined-cycle power plants |
2850 (USD) |
via email in
1-10 business day
|
VALID
|
|
DL/T 845.3-2004 |
General specifications for measuring resistance equipments Part 3: DC resistance meters |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 768.6-2002 |
Manufacture quality specification for electric power fittings welding |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5210.3-2009 |
Code for construction quality acceptance and evlauation of electric power construct Part 3:turbine generator unit |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DL/T 765.3-2004 |
Overhead insulated conductor fittings of rated voltages up to 10kv |
270 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 890.404-2009 |
Energy management system application program interface(EMS-API)Part 404:High speed data access(HSDA) |
255 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5154-2002 |
Technical regulation of design for tower and pole structures of overhead transmission line |
2010 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
|