Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 15149.2-1998 |
Performance and testing of teleprotection equipment of power systems Part 2: Analogue comparison systems |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DL/T 838-2003 |
Guide of maintenance for power plant equipments |
1260 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 1132-2009 |
Maintaining guide of boiler water circulating pump motor for power station |
195 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1013-2006 |
Test and adjustment guide of microcomputer-based excitation regulator for large and medium hydraulic generators |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DL/T 797-2001 |
Code on maintenance of wind farm |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5072-2007 |
Code for designing insulation and painting of fossil fuel power plant |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 12326-2008 |
Power quality - Voltage fluctuation and flicker |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 467-2004 |
Performance test for pulverizers and pulverizing systems of power station |
885 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
T/CEC 156.3-2018 |
Technical specification for intelligent coal system of thermal power plant Part 3: Equipment and facility for coal of weighting and analysis |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 860.91-2006 |
Communication networks and systems in substations Part 9-1: Specific communication service mapping (SCSM) -- Sampled values over serial unidirectional multidrop point to point link |
315 (USD) |
via email in
1-3 business day
|
|
|
DL/T 5394-2007 |
Code for anticorrosion of under ground steel structure in power project |
855 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 890.1-2007 |
Energy management system application program interface(EMS-API)-Part 1: Guidelines and general requirements |
450 (USD) |
via email in
1-3 business day
|
VALID
|
|
T/CEC 125-2016 |
Test methods for quantitative determination of total corrosive sulfur in unused and used mineral insulating oils |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 846.6-2004 |
General technical specifications for high voltage test equipments Part 6: SF6 gas leak detector |
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5428-2009 |
Technical code for design of I&C protection system in fossil fuel power plant |
1020 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 790.442-2004 |
Distribution automation using distribution line carrier system -- Part 4-42: Data communication protocols -- Application protocols -- Application layer |
510 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 5032-2005 |
Technical code of general plan transportation design for fossil fuel power plants |
2700 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 852-2004 |
Guide for boiler start-up commissioning test |
420 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5210.2-2009 |
Code for construction quality acceptance and evaluation of electric power construct Part 2:boiler unit |
8865 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 894-2004 |
Guide of commissioning for ash and slag handling system in power plant |
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|