Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 748.4-2001 |
Guide ofmaintenance of boiler unit for thermal power station Part 4 : The maintenance of pulverized coal system |
885 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
GB/T 36699-2018 |
Specification for liquid fuels and gaseous fuels burners of boilers |
1020 (USD) |
via email in
1-8 business day
|
VALID
|
|
GB/T 14812-1993 |
The testing method of heat transfer performance for gravity heat pipe |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 10658-1989 |
Analytical methods for boiler water and colling water-Determination of iron in prefilming liquid containing phosphorus and zinc-Sulphosalicylic acid spectrophotometry |
30 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 22395-2008 |
Specification for design of boiler steel structures |
1320 (USD) |
via email in
1-10 business day
|
VALID
|
|
DL/T 748.10-2001 |
Guide of maintenance of boiler unit for thermal power station Part 10 : The maintenance of fossil-fired PP FGD equipment |
285 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 16507.3-2013 |
Water-tube Boilers—Part 3:Structure design |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 959-2014 |
The code of safety valves for power station boilers |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 9222-2008 |
Strength calculation of pressure parts for watertube boilers |
1050 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
GB/T 11943-2008 |
Boiler drawings |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 10863-2011 |
Thermal test method for gas pass heat recovery boiler |
660 (USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 16507.8-2013 |
Water-tube Boilers—Part 8:Installation and operation |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 9082.2-2011 |
Heat pipes with wick inside |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 1576-2008 |
Water quality for industrial boilers |
435 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 16507-1996 |
Rules for construction of stationary boilers |
1860 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
GB/T 3166-1988 |
Specifications for hot water boiler |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 29466-2012 |
Plate heat exchanger unit |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 14812-2008 |
Testing method for heat transfer performance of heat pipes |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 10184-1988 |
Performance test code for utility boiler |
1770 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
GB/T 27698.1-2011 |
Test method for the performance of heat exchangers and heat exchange element—Part 1:General requirements |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
|