Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 30576-2014 |
Specification of heat recovery boiler for notary cement kiln |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 748.8-2001 |
Guide of maintenance of boiler unit for thermal power station Part 8 : The maintenance of air preheater |
450 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 10180-2017 |
Thermal performance test code for industrial boilers |
1140 (USD) |
via email in
1-8 business day
|
VALID
|
|
GB/T 14813-1993 |
Life testing method for heat pipe |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 27698.4-2011 |
Test method for the performance of heat exchangers and heat exchange element—Part 4:Spiral heat exchanger |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 16508.5-2013 |
Shell boilers—Part 5:Safety appurtenances and instruments |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 10820-2002 |
Thermal efficiency and test methods of boilers for daily life |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DL/T 748.9-2001 |
Guide of maintenance of boiler unit for thermal power station Part 9 : The maintenance of fly ash system |
285 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 16507.5-2013 |
Water-tube Boilers—Part 5:Fabrication |
600 (USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 10868-2018 |
Steam converting valves for power station |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 12145-2008 |
Quality criterion of water and steam for generating unit and steam power epuipment |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB 12152-1989 |
Analysis of water used in boiler and cooling system-The determination of mineral oil-Infrared photometric method |
45 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB 12146-1989 |
Analysis of water used in boiler and cooling system-Determination of ammonia-Method with phenol |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 14811-2008 |
Heat pipe terminology |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 10184-2015 |
Performance test code for utility boiler |
1200 (USD) |
via email in
1-8 business day
|
VALID
|
|
GB/T 3166-2004 |
Parameters for hot water boilers |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
DB43/T 1177-2016 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 12154-1989 |
Analysis of water used in boiler and cooling system-Determination of total aluminum |
60 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 9222-1988 |
Strength calculation of pressure parts for watertube boilers |
1365 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
GB/T 14813-2008 |
Life testing method for heat pipes |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
|