Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 16656.1-1998 |
Industrial automation systems and integration--Product data representation and exchange--Part 1:Overview and fundamental principles |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 25927-2010 |
Industrial-process measurement and control instrument panels—Methods of drawing the arrangement plan of panel area |
(USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 19659.5-2010 |
Industrial automation systems and integration—Open systems application integration framework—Part 5:Reference description for ISO HDLC-based control systems |
(USD) |
via email in
1-10 business day
|
VALID
|
|
HG/T 20636.9-1998 |
Checking list for review and approval for engineering design of instrumentation |
(USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 20723-2006 |
General specifications of Arc welding robots |
(USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 19769.2-2015 |
Function blocks—Part 2:Software tools requirements |
(USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 26803.3-2011 |
Industrial control computer system—Bus—Part 3:System external bus—General specification for parallel interface |
(USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 20719.11-2010 |
Industrial automation systems and integration - Process specification language -Part 11: PSL core |
(USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 17645.511-2010 |
Industrial automation systems and integration - Parts library - Part 511: Mechanical systems and components for general use:Reference dictionary for fasteners |
(USD) |
via email in
1-10 business day
|
VALID
|
|
GB/T 17214.2-2005 |
Operating conditions for industrial-process measurement and control equipment—Part 2:Power |
(USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 37395-2019 |
General specifications of meal delivery service robot |
(USD) |
via email in
1-3 business day
|
VALID
|
|
HG/T 20637.5-1998 |
Preparation of instrumentation requisition |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 27758.1-2011 |
Industrial automation systems and integration—Diagnostics,capability assessment and maintenance applications integration—Part 1:Overview and general requirements |
(USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 16656.505-2010 |
Industrial automation systems and integration—Product data representation and exchange—Part 505:Application interpreted construct:Drawing structure and administration |
(USD) |
via email in
1-5 business day
|
VALID
|
|
GB/Z 16656.1006-2010 |
Industrial automation systems and integration—Product data representation and exchange—Part 1006:Application module:Foundation representation |
(USD) |
via email in
1-3 business day
|
VALID
|
|
HG/T 4276-2011 |
Magnetic force level meter for liquefied gas tank trucks |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
HG/T 20637.4-1998 |
Preparation of requirements for instrumentation construction and erection |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 22281.2-2011 |
Condition monitoring and diagnostics of machines—Data processing,communication and presentation—Part 2:Data processing |
(USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 30372-2013 |
Guide for acceptance of distributed control system in fossil fuel power plant |
(USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 26804.7-2017 |
Industrial control computer system--Function module--Part 7: General technical conditions and evaluation methods for video capture module |
(USD) |
via email in
1 business day
|
VALID
|
|
|