Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 19114.44-2012 |
Industrial automation systems and integration - Industrial manufacturing management data - Part 44: Information modelling for shop floor data acquisition |
540 (USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 25926-2010 |
Industrial-process measurement and control instrument panels—Methods of drawing the wiring and piping diagrams |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 29247-2012 |
General methods for testing the performance of industrial process measurement and control instruments |
720 (USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 13283-2008 |
Accuracy class of measuring instruments and display instruments for industrial process measurement and control |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 22270.4-2015 |
Industrial automation systems and integration—Service interface for testing applications—Part 4:Device capability profile template |
1380 (USD) |
via email in
1-10 business day
|
VALID
|
|
GB/T 13969-2008 |
Displacement type level instruments |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 9469.4-1988 |
Process data highway,type C(PROWAY C), for distributed process control systems-The PROWAY link control (PLC) sublayer |
250 (USD) |
via email in
1 business day
|
ABOLISHED
|
|
GB/T 7523-1987 |
Subroutines for CAMAC |
285 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 27758.2-2015 |
Industrial automation systems and integration—Diagnostics,capability assessment and maintenance applications integration—Part 2:Descriptions and definitions of application domain matrix elements |
600 (USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 9469.9-1988 |
Process data highway,type C(PROWAY C),for distributed process control systems-Single-channel coaxial-cable-bus medium layer specification |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 26815-2011 |
Terminologies for industrialprocess measurement and control instruments—Terms of final controlling elements |
600 (USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 9469.7-1988 |
Process data highway,type C (PROWAY C),for distributed process control systems-MAC-physical layer interface specification |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 16656.201-1998 |
Industrial automation systems and integration--Product data representation and exchange-- Part 201: Application protocol:Explicit draughting |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 17645.1-2001 |
Industrial automation systems and integration--Parts library--Part 1:Overview and fundamental principles |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
HG/T 20636.8-1998 |
Produce of quality assurance for engineering design of instrumentation |
795 (USD) |
via email in
1-8 business day
|
VALID
|
|
GB/T 22270.1-2008 |
Industrial automation systems and integration - Service interface for testing applications - Part 1: Overview |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 18271.2-2017 |
Process measurement and control devices—General methods and procedures for evaluating performance—Part 2:Tests under reference conditions |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 3369.1-2008 |
Analogue signals for process control systems - Part 1: Direct current signals |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 31982-2015 |
Modular design specification of mechanical products |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 25510-2010 |
Mechanical systems and components for general use - Reference dictionary for rolling bearings |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
|