Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB 50469-2008 |
Code for design of environmental protection of rubber factory |
495 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SH/T 3158-2009 |
Tubular surplus heat boiler for petrochemical industry |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SH/T 3540-2007 |
Specification for construction and acceptance of complex coating for steel heat exchanger bundle |
270 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
HG/T 20701.3-2000 |
|
135 (USD) |
via email in
1-3 business day
|
VALID
|
|
SH/T 3042-2007 |
Design specification of heating ventilation and air conditioning for synthetic fiber |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
HG/T 20704.10-2000 |
|
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
SH/T 3151-2013 |
Tehnical specification for rotary pumps in petrochemical industry |
435 (USD) |
via email in
1-3 business day
|
VALID
|
|
SH/T 3419-2007 |
Steel swage(d) nipples |
270 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SH/T 3105-2000 |
Instrument location plan symbols and alphabet code for refinery |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SH/T 3080-2013 |
|
405 (USD) |
via email in
1-3 business day
|
VALID
|
|
HG/T 20703.2-2000 |
|
75 (USD) |
via email in
1-3 business day
|
VALID
|
|
SH/T 3117-2013 |
Calculation method for design of thermal medium consumption in petrochemical industry |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
SH/T 3065-2005 |
Technical standard for return bends and elbows of tubular heater in petrochemical industry |
225 (USD) |
via email in
1-3 business day
|
VALID
|
|
HG 20546.3-1992 |
|
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
SH/T 3066-2005 |
Design specification for frame of reactor and regenerator in petrochemical industry |
585 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SH/T 3515-2003 |
Construction standard for large-size equipment hoisting engineering |
1260 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
HG/T 20692-2014 |
Specification on Content and Procedure of Detail Design of Thermal Engineering for Chemical Plant |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SH/T 3021-2013 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SH 3501-2011 |
Construction and acceptance Specification for toxic and combustible medium steel piping engineering in petrochemical industry |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SH/T 3604-2009 |
Technical specificaton for the application of cement-based nonshrinkage grouting materials in petrochemical industry |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
|