Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SL 222-1999 |
Guidelines of power system designing for rural hydropower supplied regions |
300 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SDJ 53-1983 |
|
2175 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
SDJ 336-1989 |
|
1035 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
SL/T 225-1998 |
Standard for applications of geosynthetics in hydraulic and hydro-power engineering |
600 (USD) |
via email in
1-5 business day
|
VALID
|
|
SL/T 179-1996 |
Specification on compiling preliminary design report of small hydropower stations |
810 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
SL 593-2013 |
Guidelines of calculating ecological benefit on the project of small hydropower substituting for fuel |
120 (USD) |
via email in
1-3 business day
|
|
|
SL 229-2000 |
Specification on automation design of small hydropower station |
360 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SL/T 205-1997 |
Desire standards of hydropower headrace and fore bay |
1515 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 5113.8-2000 |
Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering (eight) Hydraulic roller compacted concrete engineering |
360 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5416-2009 |
Specification of strong motion safety monitoring for bydraulic structures |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 1104-2009 |
Potentiometric Readout |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5386-2007 |
Design guide for concrete precooling system of hydropower and water conservancy project |
1110 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 5192-2004 |
Design guide of construction general layout for hydropower and water conservancy project |
795 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
SL 294-2003 |
Guidelines of reconnaissance for rural hydropower station development program |
330 (USD) |
via email in
1-3 business day
|
|
|
SL 379-2007 |
Design specification for hydraulic retaining wall |
2055 (USD) |
via email in
1-10 business day
|
VALID
|
|
DL/T 5135-2001 |
Specifications of excavation blasting for hydropower and water conservancy project |
1110 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 5330-2005 |
Code for mix design of hydraulic concrete |
930 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
SL/T 188-1996 |
Code of geological investigation for levee project |
690 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 5058-1996 |
Specifications for design of surge chamber of hydropower stations |
660 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 5112-2000 |
Construction specifications for hydraulic roller compacted concrete |
420 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|