code of china Chinese Classification Professional Classification ICS Classification Latest News

LoginRegister
Position: Standard Search VALID TO BE VALID SUPERSEDED TO BE SUPERSEDED ABOLISHED TO BE ABOLISHED
Standard No. Title Price(USD) Delivery Status Add To Cart
CJ/T 83-2016 Inclined tube for water and wastewater treatment 180 (USD) via email in 1-3 business day VALID
CJ/T 260-2007 Heat cost allocators with electrical energy supply 180 (USD) via email in 1-3 business day
CJJ 10-1986 135 (USD) via email in 1-3 business day
CJ 266-2008 Safety regulations for cold potable water meters 135 (USD) via email in 1-3 business day VALID
CJ/T 133-2007 Integrated circuit card water meter via email in 1-3 business day ABOLISHED please email coc@codeofchina.com for quotation
DG/TJ 08-308-2002 Engineering technology specification of buried plastic drainage pipeline 690 (USD) via email in 1 business day VALID
SH 3034-1999 Code for the piping design of watersupply and drainage in petrochemical industry 870 (USD) via email in 1-8 business day ABOLISHED
CJ/T 282-2016 Slow closure butterfly check valve 220 (USD) via email in 1 business day VALID
DBJT 08-1975-1996 via email in ABOLISHED please email coc@codeofchina.com for quotation
DB31/T 478.6-2010 via email in VALID please email coc@codeofchina.com for quotation
CECS 143-2002 435 (USD) via email in 1-3 business day VALID
TBJ 209-1996 660 (USD) via email in 1-5 business day ABOLISHED
CECS 222-2007 Specification for Design of central hot water supply system in sub-district 600 (USD) via email in 1-5 business day VALID
TB 10010-1998 Code for design of water supply and sewerage of railway 750 (USD) via email in 1-5 business day
CECS 184-2005 Technical specification for prevention of backflow pollution in water supply system 390 (USD) via email in 1-3 business day VALID
SB/T 10874-2012 Water-saving requirement for meat,eggs and their products fabrication plant 180 (USD) via email in 1-3 business day VALID
CJ/T 186-2003 Floor drain 210 (USD) via email in 1-3 business day ABOLISHED
CECS 162-2004 Specification for construction and acceptance of instrumentation automation control engineering in water supply and wastewater 765 (USD) via email in 1-8 business day VALID
DBJ/CT 508-2001 480 (USD) via email in 1-5 business day ABOLISHED
CJ/T 196-2004 Film fast sludge-drainage valve 120 (USD) via email in 1-3 business day VALID
About Us | Contact Us | Terms of Service | Privacy | Cancellation & Refund Policy | Payment
Tel:+86-10-8572 5655 Fax:+86-10-8581 9515 Email: coc@codeofchina.com QQ: 672269886
Copyright:TransForyou Co., Ltd. 2008-2020