Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 5178-2003 |
Technical specification for concrete dam saftey monitoring |
2100 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/Z 890.401-2006 |
Energy management system application program interface(EMS-API)-Part 401:Component interface specification(CIS) framework |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 503-2009 |
Classification and coding regulations for electric power engineering projects |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 757-2009 |
Strain Clamp |
135 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 972-2005 |
Live working-quality assurance plans applicable to tools devices and equipment |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1057-2007 |
Specification of arc suppressing coil apparatus with automatic follow compensation |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5188-2004 |
Design code of vibration isolation of auxiliary machine foundation in fossil fuel power plant |
1050 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 1058-2007 |
Technical specification of composite insulators spacer between phase for a.c.overhead lines |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL 5068-2014 |
Code for design of chemistry of power plant |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/Z 860.1-2004 |
Communication networks and systems in substations Part 1: Introduction and overview |
420 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 569-1995 |
Methods for collection of coal samples from ship |
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1103-2009 |
|
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DL/T 604-1996 |
Specification of high-voltage shunt capacitor installations for order |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 812-2002 |
Insulators string for overhead lines with a normal voltage above 1000V-AC power arc test method |
195 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 896-2004 |
Basic parameters QPKY hydraulic hoist for quick-closing hydraulic plane gate |
75 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 522.2-1993 |
Determination of acetoxime (DMKO) in water |
60 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 634.5101-2002 |
Telecontrol equipment and systems Part 5 : Transmission protocols Section 101 : Companion standard for basic telecontrol tasks (IEC 60870-5-101 : 2002 IDT) |
2010 (USD) |
via email in
1-10 business day
|
VALID
|
|
DL/T 888-2004 |
Electric power system dispatching exchange specification of DTMF signalling |
195 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 839-2003 |
Performance test in site for the large boiler feedwater pump (ISO 5198:1987(E) Centrifugal mixed flow and axial pumps -- Code for hydraulic performance tests NEQ) |
555 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 854-2004 |
Live working -- Care maintenance and in-service testing of aerial devices with insulating booms |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|