Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
JT/T 1211.2-2019 |
Rapid repairing material of cement concrete for highway engineering—Part 2:Polymer resin repair material |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
JC/T 945-2005 |
Water Permeable Brick |
225 (USD) |
via email in
1-3 business day
|
|
|
JT/T 536-2004 |
Atactic polypropylene (APP) asphalt waterproof roll for roads and bridges |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
JT/T 535-2004 |
Water quality asphalt waterproof coating for roads and bridges |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
JT/T 538-2004 |
Highway engineering -- Rigid extruded polystyrene foam board for thermal insulation (XPS) |
135 (USD) |
via email in
1-3 business day
|
|
|
JT/T 799-2011 |
Technical requirements of processing equipment of asphalt rubber |
60 (USD) |
via email in
1-3 business day
|
VALID
|
|
JT/T 532-2004 |
Garbon fiber reinforced polymer laminate for bridge structures |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 38948-2020 |
Evaluation method for the cracking resistance of asphalt mixture at low temperature |
180 (USD) |
via email in
1-3 business day
|
TO BE VALID
|
|
JT/T 1127-2017 |
Technical requirements for continuous compaction control system of fill engineering of subgrade for highway |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
JT/T 1087.1-2016 |
Geosynthetics in highway engineering–Drainage materials –Part 1:Drainagegeocomposite |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DB51/T 2514-2018 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
JT/T 1089-2016 |
Modified materials in pavement asphalt——Thermoplastic elastomers based on the waste rubber and plastic |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
JT/T 1149-2017 |
Layered double hydroxides anti ultraviolet aging agent used for pavement asphalt |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
JT/T 537-2004 |
Corrosion inhibitor for reinforcing steel in concrete |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DB51/T 2512-2018 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 23458-2009 |
Ceramic tile for plaza |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
JT/T 797-2011 |
Ground vulcanized rubber of scrap tires for highway engineering |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
JG/T 376-2012 |
|
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
JTG E 50-2006 |
Test Methods of Geosynthetics for Highway Engineering |
1710 (USD) |
via email in
1-10 business day
|
VALID
|
|
DB37/T 3564-2019 |
Specification for the Design and Construction of Anti-rutting and Anti-fatigue High Modulus Asphalt Concrete |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
|