Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
CECS 162-2004 |
Specification for construction and acceptance of instrumentation automation control engineering in water supply and wastewater |
765 (USD) |
via email in
1-8 business day
|
VALID
|
|
JC/T 743-1984(1996) |
Guides of laying for asbestos-cement water and gas pipelines |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
CJ/T 470-2015 |
Pressure regulators for liquefied dimethyl ether cylinders |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
CJ/T 125-2014 |
Steel framed polyethylene plastic pipes and fittings for supply of gaseous fuels |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
HG/T 20697-2007 |
Purchase specification on heating Ventilating and air conditioning equipment for chemical plant |
2355 (USD) |
via email in
1-10 business day
|
VALID
|
|
CJ/T 233-2016 |
Plastic inspection chamber for sewerage in building area |
840 (USD) |
via email in
1-8 business day
|
VALID
|
|
GB/T 38522-2020 |
Outdoor gas-burning appliance |
660 (USD) |
via email in
1-5 business day
|
TO BE VALID
|
|
CJ/T 463-2014 |
Light gauge stainless steel for press-fittings |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
CJ/T 252-2007 |
Technical requirement of automatic monitor system for city drainage |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 23248-2009 |
Code for design of seawater treatment for recirculating cooling seawater system |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 26002-2010 |
Stainless steel pliable corrugated tubing and fittings used in gas piping systems |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
CJ/T 219-2017 |
Hydraulic control valves |
480 (USD) |
via email in
1-5 business day
|
VALID
|
|
CJ/T 275-2008 |
City gas pressure regulating station |
195 (USD) |
via email in
1-3 business day
|
|
|
CJ/T 468-2014 |
|
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 38530-2020 |
Town liquefied natural gas(LNG)gasification supply installations |
840 (USD) |
via email in
1-8 business day
|
TO BE VALID
|
|
CJ/T 257-2014 |
|
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB 29550-2013 |
General safety technique conditions for gas in civil building |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
HY/T 115-2008 |
Seawater desalination engineering design for distillation |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
CJ/T 323-2015 |
Steel wire reinforced ultra-high molecular weight polyethylene composite pipe |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
CJ/T 528-2018 |
Swimming pool dehumidification and heat recovery heat pump |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
|