Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
JC 514.1-1993 |
|
225 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 18736-2002 |
Mineral admixtures for high strength and high performance concrete |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB 15762-2008 |
Autoclaved aerated concrete slabs |
330 (USD) |
via email in
1-3 business day
|
VALID
|
|
JG/T 228-2007 |
Technical requirements of external thermal insulation with expanded polystyrene panel for in situ concrete |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
JG 3063-1999 |
Concrete hollow panels contained industrial fly ash and waste slags for partition wall in buildings |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
JG/T 3023-1995 |
Test method of concrete compressive strength for extrution hollow cored slab |
75 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
JC 431-1991(1996) |
|
75 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 8077-2012 |
Methods for testing uniformity of concrete admixture |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
DG/TJ 08-230-2006 |
Technique of powdered coal ash concrete application |
420 (USD) |
via email in
1 business day
|
VALID
|
|
JG/T 327-2011 |
Plant fiber-industrial waste slag concrete block |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
JC/T 2162-2012 |
Safety production requirements for prestressed concrete piles |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
JC/T 950-2005 |
Ground silica sand used for pretensioned spun high-strength concrete piles |
135 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 8239-2014 |
Normal concrete small block |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 24493-2009 |
Decorative concrete brick |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
DG/TJ 08-507-2003 |
The specification code for non-destructively testing the compressive strength of high-strength concrete |
360 (USD) |
via email in
1 business day
|
VALID
|
|
JGJ 63-2006 |
Standard of water for concrete |
375 (USD) |
via email in
1-3 business day
|
VALID
|
|
JC 889-2001 |
Steel fiber reinforced concrete checking well cover |
195 (USD) |
via email in
1-3 business day
|
VALID
|
|
JC 538-1994 |
|
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
JC/T 582-1995 |
|
135 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 18601-2009 |
Natural granite for building slab |
210 (USD) |
via email in
1-3 business day
|
VALID
|
|
|