Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 24244-2009 |
Iron oxide for ferrite |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 1817-2017 |
Test method for impact toughness of cemented carbidesat room temperature |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
JB/T 8063.3-2011 |
Methods for chemical analysis of powder metallurgy materials and products —Part 3:The thiocyanate photometric method for the determination of molybdenum in iron-based materials and products |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 6804-2002 |
Sintered metal bushes--Determination of radial crushing strength |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
JB/T 8063.2-2011 |
Methods for chemical analysis of powder metallurgy materials and products — Part 2:The ammonium hydrogen fluoride masking iodometriy method for the determination of copper in iron-based materials and products |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 6888-1986 |
Sintered nickel filter |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 23271-2009 |
Molybdenum disulfide |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 5124.3-2017 |
Hardmetals—Part 3:Determination of cobalt—Potentiometric method |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 6481-1994 |
Hollow hexagonal drill rods with tapered connection for rock drilling |
75 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
YB/T 5308-2006 |
Reduced iron powders for powder metallurgy |
45 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 5158.2-2011 |
Metallic powders—Determination of oxygen content by reduction methods—Part 2:Loss of mass on hydrogen reduction(hydrogen loss) |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
YS/T 295-1994 |
Hard metal (carbide) for construction material drilling tools |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
YS/T 61-2007 |
Cemented carbide rolls for high-speed wire rods |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 3849.1-2015 |
Hardmetals—Rockwell hardness test(scale A)—Part 1:Test method |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 9096-2002 |
Sintered metal materials,excluding hardmetals--Inpact test method |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 7160-2017 |
Carbonyl nickel powder |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB 5249-1985 |
Permeable sintered metal materials; Determination of bubble test pore size |
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 5159-2015 |
Metallic powders,excluding powders for hardmetals—Determinationof dimensional changes associated with compacting and sintering |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
JB/T 8063.1-2011 |
Methods for chemical analysis of powder metallurgy materials and products— Part 1:The gas volumetric method for the determination of carbon in iron-based materials and products |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
YS/T 1010-2014 |
Test method for ring tensile strength of sintered porous metal |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
|