Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 5534-2007 |
Universal speciafications for oilfield special vehicles |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5112-1999 |
Specification for drilling and production hoisting equipment |
345 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6391-1999 |
SEG-D seismic tape format |
660 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
GB/T 21412.6-2018 |
Petroleum and natural gas industries—Design and operation of subsea production systems—Part 6:Subsea production control systems |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 16750.2-1997 |
Electrical submersible pump-Technical specifications |
225 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5880.2-1993 |
|
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6875-2012 |
Buckling strength of plated structures |
525 (USD) |
via email in
1-5 business day
|
VALID
|
|
SY/T 6160-2008 |
Check and maintenance of blowout preventer |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6478-2000 |
The technical conditions for nickel-phosphorus plating through autocatalytic process of tubings |
60 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5443-2001 |
Hydraulic and pneumatic control components of control systems for surface mounted BOP stacks |
495 (USD) |
via email in
1-5 business day
|
|
|
SY/T 10003-1996 |
Specification for offshore cranes |
495 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 6357-1998 |
|
135 (USD) |
via email in
1-3 business day
|
|
|
SY/T 6726-2008 |
Top drive drilling system for oil drilling rigs |
315 (USD) |
via email in
1-3 business day
|
|
|
SY/T 6736.2-2008 |
Marine seismic digital streamer system-Part 2:Standards for specifying hydrophone streamer-cable characteristic |
330 (USD) |
via email in
1-3 business day
|
|
|
SY/T 6731-2008 |
Snubbing equipment |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6643-2013 |
Technical specification of multiwave and multicomponent seismic data acquisition on land |
255 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5207-1987 |
|
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 18607-2017 |
Petroleum and natural gas industries—Drilling and production equipment—Reciprocating full liner pump |
1800 (USD) |
via email in
1-10 business day
|
VALID
|
|
SY/T 6194-2003 |
Petroleum and natural gas industries -- Steel pipes for use as casing or tubing for wells |
3795 (USD) |
via email in
1-10 business day
|
|
|
SY/T 10002-2000 |
Specification for the Fabrication of Structural Steel Pipe |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
|