Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 6423.1-2013 |
Petroleum and natural gas industries—Non-destructive testing (NDT) methods of steel tubes—Part1:Radiographic testing of weld seam of welded steel tubes for detection of imperfections |
255 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 10025-1999 |
drilling Rig Pre-Drilling Inspection Specification |
615 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 5931-2000 |
|
255 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5144-2007 |
Drill collar |
300 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 20661-2006 |
Petroleum and natural gas industries - Flexible pipe systems for subsea and marine riser applications |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 6839-2013 |
Navigation and positioning technical specifications for towed streamers seismic survey |
375 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 19832-2017 |
Petroleum and natural gas industries—Inspection,maintenance,repair and remanufacture of drilling and production hoisting equipment |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6539-2002 |
The checking items and technical specifications for BOX seismic data acquisition system |
105 (USD) |
via email in
1-3 business day
|
|
|
GB/T 23505-2009 |
Petroleum drilling and workover rigs |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6930-2012 |
|
510 (USD) |
via email in
1-5 business day
|
VALID
|
|
SY/T 6288-2007 |
Practice for selection and use of drill pipe and drill collar |
255 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 10023.1-2012 |
Method of offshore oil/gas field development project economic evaluation—Part1:Self-financed offshore oil/gas field |
450 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6841-2011 |
Electromagnetic time-frequency instrument |
390 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6033-1994 |
|
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 7086-2016 |
Petroleum and natural gas industries. Drilling and production equipment. Fracturing pumping equipment |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 6971-2013 |
Multi-parameter drilling instrumentation testing equipment |
315 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6627-2005 |
The calibration method of the seismic data recording system |
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 33683-2017 |
Technical specifications of surveying and positioning for petroleum geophysical prospecting on land |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY 5066.2-1993 |
|
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 22342-2008 |
Petroleum and natural gas industries - Subsurface safety valve systems - Design installation operation and redress |
480 (USD) |
via email in
1-5 business day
|
VALID
|
|
|