Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
YBJ 228-1991 |
|
330 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 2885.3-1981 |
Single-side tipping and curved rail wagon for metallic mines;Basic parameters and dimensions |
45 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
MT/T 777-1998 |
Boom-type roadheaders-Airborne spraying pump station-Technical condition |
75 (USD) |
via email in
1-3 business day
|
VALID
|
|
MT/T 188.5-2000 |
Specification of safety valve for mine emulsion pump station |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB 50276-1998 |
Code for construction and acceptance of crusher and mill equipment installation engineering |
570 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
LD 87.7-1996 |
Specifications on safety technical inspection of mine hoisting system Part 7: Inspection of wire rope and attachment |
270 (USD) |
via email in
1-3 business day
|
VALID
|
|
MT/T 662-1997 |
Spraying nozzle for shearer---Outlet diameters and connecting threads |
45 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
AQ 1016-2005 |
Safety inspecting-testing specification of in-service hoist system for coal mine |
165 (USD) |
via email in
1-3 business day
|
VALID
|
|
MT/T 587-1996 |
|
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 2885.5-1981 |
Flat deck wagon for metallic mines; Basic parameters and dimensions |
30 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
MT/T 355-2005 |
|
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 7679.5-2003 |
Mining machinery terminology—Part 5:Crushing and grinding equipment |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB 25526-2010 |
Shaft boring machines - Safety requirements |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
YSJ 414-1993 |
|
1155 (USD) |
via email in
1-8 business day
|
VALID
|
|
MT/T 696-1997 |
General technical condition of high-ratio-foam fire extinguisher equipment for coal mine |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
MT/T 770-1998 |
General technical condition of frequency division ON/OFF signal transmission unit for coal mine |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
AQ 1014-2005 |
Safety inspecting-testing specification of in-service friction hoist system for coal mine |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB 25974.1-2010 |
Powered support for coal mine—Part 1:General specification |
480 (USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 2885.6-1981 |
Material supply wagon for metallic mines; Basic parameters and dimensions |
45 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
MT/T 229-2005 |
General specifications of instrument for the determination of the crucible swelling number of bituminous coal-electrical heating |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
|