Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 16559-1996 |
Emergency list for shipboard oil spillage |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB 11572-1989 |
Test methods of marine gearbox |
90 (USD) |
via email in
1-3 business day
|
|
|
GB/T 2884.2-2009 |
中华人民共和国国家质量监督检验检疫总局 中国国家标准化管理委员会 |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
CB 1270-1995 |
|
135 (USD) |
via email in
1-3 business day
|
VALID
|
|
CB/T 3870-1999 |
General specification for push button in ships |
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 20132-2006 |
Ships and marine technology -- Low-location lighting on passenger ships -- Arrangement |
270 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
CB/T 787-1993 |
|
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB 3894.8-1985 |
Figure symbols on the arrangement plant of ship deck machinery |
75 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
CB/T 3471-1992 |
|
60 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
CB/Z 281-2011 |
Guidelines for selection and usage of gaskets and stuffing in vessel piping system |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 7727.5-1991 |
General terminology for ships-Ship environment |
75 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
CB/T 3911-1999 |
General disposition and design rules of mooring equipment for sea-going ship |
345 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 16558.1-1996 |
The ship maintenance system-General rules |
75 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 4476.1-1984 |
Drawings for metal hull of ships;General provisions |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
CB/T 3852.8-1999 |
The types parameters and main sizes of table lights for marine use |
30 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
CB/T 3366-1998 |
Technical requirements of coating plastic for steel pipe |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 4476.1-2008 |
Drawing for metal hull of ships - Part 1: General provisions |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
CB/T 3893-1999 |
Vertical planetary gear units for the marine |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
CB/T 3688-1995 |
|
165 (USD) |
via email in
1-3 business day
|
VALID
|
|
CB/T 3445-1992 |
|
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|