Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 25121.2-2018 |
Railway applications—Rolling stock equipment—Capacitors for power electronics—Part 2:Aluminium electrolytic capacitors with non-solid electrolyte |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 24338.4-2018 |
Railway applications—Electromagnetic compatibility—Part 3-2:Rolling stock—Apparatus |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 25123.1-2010 |
Electric tracion—Rotating electrical machines for rail and road vehicles—Part 1:Machines others than electronic convertor-fed alternating current motors |
780 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
TB 2074-2010 |
Test methods of fittings for overhead contact system in electrification railway |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
TB/T 2803-2003 |
Technical specification of circuit-breaker for AC electrification railway |
225 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 21561.4-2018 |
Railway applications—Rolling stock pantograph characteristics and tests—Part 4:Interface between pantograph and rolling stock for metros and light rail vehicles |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
TB/T 3249-2010 |
Roof cabling for high voltage section of rolling stock |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 32580.301-2016 |
Railway applications—Fixed installations—Particular requirements for a.c. switchgear—Part 3-1:Measurement,control and protection devices for specific use in a.c. traction systems—Application guide |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 34141-2017 |
Network control system for high speed train |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 25890.4-2010 |
Railway applications—Fixed installations—DC switchgear—Part 4:Outdoor d.c.disconnectors switch-disconnectors and earthing switches |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 24338.3-2018 |
Railway applications—Electromagnetic compatibility—Part 3-1:Rolling stock—Train and complete vehicle |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
TB/T 1391-2007 |
Locomotive controller |
|
via email in
|
|
please email coc@codeofchina.com for quotation
|
GB/T 32589-2016 |
Railway application—Third-rail current collector |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 21561.2-2018 |
Railway applications—Rolling stock pantographs characteristics and tests—Part 2:Pantographs for metros and light rail vehicles |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 25020.4-2010 |
Steel pole for overhead contact system of electrified railway—Part 4:H section pole |
360 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 34573-2017 |
|
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 32589-2016E |
Railway application-Third rail current collector |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
TB/T 3157-2007 |
Heat exchanger for electric locomotive main transformer |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
TB/T 1333.5-2005 |
Railway applications -- Electric Equipment for rolling stock -- Part 5: Electrotechnical Components -- Rules for HV Fuses |
315 (USD) |
via email in
1-3 business day
|
|
|
TB/T 3141-2006 |
Air-conditioning power supply of locomotive |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
|