Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 25841-2017 |
Guide of protection relaying for 1 000 kV power system |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5469-2013 |
Guidelines for feasibility study cost estimation of transmission and transformer project |
450 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 37155.2-2019 |
Technical guidance of protection and control system on regional power grid—Part 2:Information interface and communication |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
Q/GDW 480-2015 |
Technical rule for distributed resources connected to power grid |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
Q/GDW 174-2008 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 5342-2006 |
Construction technology guidance for the assembling and erection of the steel towers of 750k V overhead transmission line |
225 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 31367-2015 |
Technical guide for energy efficiency evaluation of medium and low voltage power distribution networks |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5458-2012 |
Regulations for content and depth of detailed design of substation project |
1110 (USD) |
via email in
1-8 business day
|
VALID
|
|
GB/T 35702.1-2017 |
Power losses in voltage sourced converter(VSC)valves for high-voltage direct current(HVDC)systems—Part 1:General requirements |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
GBJ 65-1983 |
Specifications for the design of grounding (earthing) of industrial and civil electric system(Trial) |
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
T/CEC 173-2018 |
Design code for distributed energy storage connecting to distribution network |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
Q/GDW 156-2006 |
The code of planning anf derign of urban electric network |
840 (USD) |
via email in
1-8 business day
|
VALID
|
|
Q/GDW 145-2006 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 5472-2013 |
Guidelines for item segregation of construction budget for overhead transmission line projects |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5344-2006 |
Acceptance specification for optical fiber telecommunication engineering of electric power |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 30149-2019 |
CIM based efficient model exchange format |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 16927.4-2014 |
High voltage and high current test techniques—Part 4: Definitions and requirements for test currents and measuring systems |
1740 (USD) |
via email in
1-10 business day
|
VALID
|
|
T/CEC 136-2017 |
Longitudinal welding pipe for transmission line steel tubular tower |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 24843-2018 |
Technical specification of 1 000 kV single phaseoil-immersed auto-transformer |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5343-2006 |
Construction technology guidance for tension stringing of 750k V overhead transmission line |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
|