Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY 0401-1998 |
Standard for consyruction and acceptance of oil and natural gas pipeline project |
570 (USD) |
via email in
1-5 business day
|
|
|
JG/T 3030-1995 |
Welded stainless steel tubes for architectural decoration |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
JG/T 225-2020 |
|
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 3091-2001 |
Welded steel pipe for low pressure liquid delivery |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
YB/T 176-2000 |
Ceramic-lined steel composite pipe |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 4105-2005 |
Technical standard of non-solvent polyurethane internal coating for steel container |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 13793-1992 |
Longitudinal electric resistance welded steel tubes |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 3092-1993 |
Welded steel pipe for low pressure service |
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
YB/T 171-2000 |
Special shaped steel tubes |
840 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
GB/T 37357-2019 |
Gast iron pipes,fittings and accessories for rain drainage of building roof |
1020 (USD) |
via email in
1-8 business day
|
VALID
|
|
GB 9948-2006 |
Seamless steel tubes for petroleum cracking |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 0429-2000 |
Standard for quality inspection and evaluation of petroleum construction engineering oil and natural gas pipeline project |
1650 (USD) |
via email in
1-10 business day
|
|
|
SY 0324-2001 |
Specification of construction and acceptance of heat insulation for buried high temperature steel pipeline |
705 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
GB/T 13295-2019 |
Ductile iron pipes,fittings and accessories for water or gas applications |
1740 (USD) |
via email in
1-10 business day
|
VALID
|
|
GB/T 14291-1993 |
Welded steel pipe for mine liquid service |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
YB/T 4179-2008 |
Water-cooled metallic tube mould for centrifugal ductile iron pipe |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 13295-2003 |
Ductile iron pipes,fittings and accessories for water or gas applications |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 34202-2017 |
Ductile iron pipes,fittings and accessories—Epoxy coating(heavy-duty) |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 6483-1986 |
Soft mechanical joint grey cast iron pipe |
345 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY 4208-2008 |
Code for quality acceptance of oil and gas construction engineering oil and gas transmission pipeline project |
915 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
|