1.0.1 This code is formulated with view to strengthening the quality management of intelligent building systems, standardizing the quality acceptance of intelligent building systems, specifying the organization procedures and qualification evaluation criteria of the quality checking and acceptance of intelligent building systems and guaranteeing the quality of intelligent building systems.
1.0.2 This code is applicable to the quality acceptance of intelligent building systems in constructed, renovated and extended engineering.
1.0.3 The quality acceptance of intelligent building systems shall not only meet those specified in this code, but also meet those specified in the relevant current standards of the nation.
2 Terminologies and Symbols
2.1 Terminologies
2.1.1 System checking and measuring
After the installation, debugging, self-checking and trial running of intelligent building system have been completed, certain methods, instruments and equipment will be adopted to conduct overall checking and testing on the system functions and performance and to provide conclusion.
2.1.2 Rectification
Modification and adjustment on the rejected item of the engineering to make it be qualified.
2.1.3 Trial running
The continuous operation process of system within specified time after the installation, debugging and self-checking of intelligent building system.
2.1.4 Project supervision
An organization dispatched by supervision organization to be responsible for the performance of supervision contract of engineering project.
2.1.5 Acceptance group
A temporary institution formed by relevant personnel under the organization of the development organization and undertaking the acceptance works during engineering acceptance.
2.2 Symbols
HFC - Hybrid Fibre Coax
ICMP - Internet Control Message Protocol
IP - Internet Protocol
PCM - Pulse Code Modulation
QoS - Quality of Service
VLAN - Virtual local Area Network
3 Basic Requirements
3.1 General Requirements
3.1.1 The quality acceptance of intelligent building systems shall cover quality control of engineering implementation, system checking and measuring, and engineering acceptance.
3.1.2 The division of sub-subsection projects and subitem projects of intelligent building systems shall meet those specified in Table 3.1.2.